If you recall awhile back I had built a niche/shelf/storage area in the bathroom above and behind the tub. It will be used for storing towels, etc up top, and blankets, etc in the compartments below. I tiled the niche area to match the floor. I still need to build the doors to cover the lower compartment. They will just be wood and painted to match the rest of the trim.


Here is the completed tile work. I also installed halogen lighting that is controlled with a wall switch.




I made a little progress trimming out the doors, I installed the first layer. I had to router the edge on 96 feet of 1"x6" boards (2 to 3 passes per board). There is still 2 more layers too add to this trim. The last piece to go on, called the "Edge Band" has to be custom milled at a lumberyard. I can't buy "clear stock" (no knots or splits) in a 2"x2" board at the regular lumber yards, I went to 7 different lumber stores! I will then have to router 3 of the edges (again 2-3 passes per edge). Basically what it boils down to is I got myself into a lot more work than I was planning on by trying to replicate the original trim that was around these doors.


The baseboards luckily didn't need any custom routering, but they are still built up out of 4 pieces of lumber. There is a 1"x8" board with a 2-1/2" rounded egg and dart trim piece on top. Covering the joint between those 2 pieces is a 1-3/8" mullion strip (not installed yet in this pic). Then along the floor is a standard 2-1/2" colonial casing. Overall the trim is about 10" tall.


Zander was hanging out while I painted the trim.

2 comments:

mom said...

lets get that paint on the wall,,, and move the bed in!! looks awsome,,, im so proud of you

heathbuggs said...

Can you build something to pop out of those doors? It looks like a little stage. Or maybe you could have some marionettes pop down.